OPERATION

Design of a DATACENTER consisting of two buildings with IT rooms (16,000m²) and a HV substation (2 x 100MVA transformers)

SECTOR
DATACENTER
OFFICES / TERTIARY
COMPLETION
2025 (studies)
DATA CENTER 100 MVA ESSONE
16 000 M² IT (2 buildings with 8 IT rooms of 1,000 M² each)
Design Project Management Mission
CLIMATE ENGINEERING
ELECTRICAL ENGINEERING
PLUMBING
INFO & TELECOM
IRVE
FIRE SAFETY
IRE PROTECTION
RENEWABLE ENERGIES
G.T.B.
ETUDES HTB
GENERATOR SET
ENERGY PERFORMANCE & QUALITY LABELS
RE 2020
AREAS OF INTERVENTION
NEW
ENERGY OPTIMIZATION
SPECIFIC TECHNICAL EXPERTISE
Photovoltaic
Energy recovery
IRVE
ENERGY CALCULATIONS
RE 2020